
Albert Česká republika
Comprehensive Energy Savings at Albert Distribution Centres
Project introduction and context
ENAT designed and verified comprehensive energy-saving measures for Albert’s distribution centres under the OPPIK Energy Savings subsidy programme (Call V).
Client and scope
Client: Albert Česká republika, s.r.o.
Scope: both distribution centres / both sites, with the same set of key measures.
Assignment: design and verification of comprehensive energy-saving measures for OPPIK Energy Savings (Call V).
Key technical measures
- Industrial refrigeration modernisation: replacement of obsolete ammonia piston compressors with highly efficient turbo-compressors using environmentally preferable HFO refrigerant (low GWP).
- Waste heat recovery: installation of heat-pump cascades using waste heat from the refrigeration process for heating and domestic hot water production.
- Heat-source refurbishment: installation of modern condensing gas boilers and optimisation of hydraulic circuits.
- Ventilation modernisation: replacement of existing air-handling units with more efficient systems featuring heat recovery and advanced demand-based output control.
Benefits achieved or expected
The total benefits are stated as the combined figures for both projects:
- total annual energy savings: 18,204 GJ/year,
- emissions reduction: 2,240 t/year,
- operating cost savings: CZK 5.67 million/year.
Subsidy programme and evaluation
Both projects demonstrated high cost-effectiveness and significant environmental benefits. They were recommended for implementation and received high scores under the subsidy criteria (more than 70 points out of 100).